Replacement of three existing high-pressure steam boiler associated with building 415 at Tomah VA Medical Center. Electrical (electrical panel upgrade) power (normal, emergency), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), communication infrastructure, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous material abatement and commissioning. This work also included all general construction, alterations, roads, walks, grading, drainage, commissioning, and necessary removal of existing structures and construction.

Highlights
  • Client: Veterans Affairs Medical Center
  • Location: Tomah, WI
  • Value: $ 11,722,000.00
  • Services: General Construction, Construction Management, Pre-construction Services