Replacement of outdated boilers in building 147 with modern boilers to improve efficiency of the boiler plant at the Dayton VA Medical Center. Work included: Electrical (electrical panel upgrade) power (normal, emergency), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), communication infrastructure, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous material abatement and commissioning. Also included were all general construction, alterations, roads, walks, grading, drainage, commissioning and necessary removal of existing structures and construction.

Highlights
  • Client: Veterans Affairs Medical Center
  • Location: Dayton, OH
  • Value: $ 6,788,000.00
  • Services: General Construction, Construction Management, Pre-construction Services

Have a project in mind?

General construction is more than erecting buildings.